I. Typical Process Route: Pretreatment equipment Module + Core Equipment Module + Post-treatment Equipment module. Brief description of the process: After pretreatment of seawater, suspended solids and impurities are removed. The effluent then enters the SWRO device for primary desalination, and an ···
I. Typical Process Routes
Pre-treatment equipment module + core equipment module + post-treatment equipment module

Brief process description: After pretreatment, suspended solids and impurities are removed from the seawater. The effluent then enters the SWRO device for primary desalination, and an energy recovery device is used to recover the residual pressure of the concentrated water for energy conservation. The water produced by SWRO then enters BWRO for deep desalination. The fresh water produced is sent to the clear water tank for disinfection and then delivered to users, ultimately obtaining fresh water that meets drinking water standards.
Ii. Equipment Features and Advantages
Art:All the equipment is standardized and modularized, flexibly combined, highly applicable, harmonious and beautiful, and combines artistry, metallic style and a sense of technology.
Environmental protection:Stainless steel material can be nearly 100% recycled, is environmentally friendly and green, and meets the requirements of "dual carbon".
Construction period:All components are prefabricated in the factory and assembled on site, making the construction simple and the construction period short.
Heat insulation:Double-layer stainless steel forms an effective heat insulation layer, which has significant advantages in high-temperature and cold regions.
Strength:It adopts an integrated U-shaped steel reinforced frame and modular integral welded structure design, which is stable and durable.
Energy conservation:It is equipped with a fresh air air conditioning system to ensure that the system operates at the optimal ambient temperature, extending the service life of the equipment. At the same time, it is equipped with a solar photovoltaic system to save energy consumption.
Intensive:The wall integrates the functions of load-bearing, enclosure and heat insulation. It is three-dimensional modeled to make full use of the space.
Intelligent:Supports fully automatic operation, automatic data analysis, remote monitoring and fault alarm.


Iii. System Operating Conditions
Adaptation conditions | Water temperature range (℃) | 5-45℃ |
The range of salt content in the influent (mg/L) | 20,000~45,000 | |
Influent turbidity range (NTU) | ≤ 30 | |
Influent TOC range(mg/L) | ≤ 10 | |
Water production performance | Conductivity of the produced water (μS/cm) | ≤500 |
Iv. Engineering Achievements
The new mine water treatment station project of Fenghuangtai Coal Industry Co., Ltd. of Hongyuan Group in Puxian County, Shanxi Province
Design unit: Jiangsu Lingzhi Environmental Protection Engineering Co., LTD
Implementing entity: Zhongling Water Environment Equipment (Linfen) Co., LTD
|
|
Previous article:No More
Next article:No More