Linquan County Sewage Treatment Plant Phase III Project

Linquan County Sewage Treatment Plant Phase III Project

Linquan County Sewage Treatment Plant Sludge Treatment Project mainly serves Linquan County Sewage Treatment Plant and Development Zone Sewage Treatment Plant, taking into account the sludge disposal needs of sewage plants in surrounding towns and towns. ), long-term 105t/d (moisture content 80%), the civil construction of sludge dewatering machine room is designed on a long-term scale of 105t/d (moisture content 80%), and the equipment is installed on a recent scale of 70t/d (moisture content 80%). The sludge deep dewatering system is designed to have a sludge moisture content of ≤60%.  

Case description

Linquan County Sewage Treatment Plant Sludge Treatment Project mainly serves Linquan County Sewage Treatment Plant and Development Zone Sewage Treatment Plant, taking into account the sludge disposal needs of sewage plants in surrounding towns and towns. ), long-term 105t/d (moisture content 80%), the civil construction of sludge dewatering machine room is designed on a long-term scale of 105t/d (moisture content 80%), and the equipment is installed on a recent scale of 70t/d (moisture content 80%). The sludge deep dewatering system is designed to have a sludge moisture content of ≤60%.
 
1.1.1 Project scale
Linquan County Sewage Treatment Plant has built the first and second phases of the project with a scale of 40,000 m3/d, the proposed third phase (2020) with a scale of 30,000 m3/d, and the fourth phase (2030) with a scale of 30,000 m3/d.
 
1.1.2 Project content
Combined with the scale of the fourth phase, the third phase of the 30,000 m3/d Linquan County Sewage Treatment Plant will be constructed.
 
1.1.3 Sewage treatment plant site
Linquan County Sewage Treatment Plant is located on Renmin East Road, Linquan County, south of Quanhe River and east of Fertilizer Plant. The completed first and second phase projects (40,000 m3/d) occupy an area of ​​4.76ha, the sludge harmless treatment project under construction occupies an area of ​​0.44ha, and the proposed third phase project will occupy 4.46ha of new land.
 
1.1.4 Inlet and outlet water quality
The main indicators of the designed influent water quality are shown in the following table, and the effluent water quality after treatment complies with the Class A standard in the Pollutant Discharge Standard for Urban Sewage Treatment Plants (GB18918-2002).
 
The main indicator unit of water quality in the design of sewage treatment plant: mg/L

 

Water quality
category

COD cr

BOD 5

SS

TN

NH3 - N

TP

Influent water quality

360

180

200

65

48

4

Effluent quality

50 

10

10

15

5(8) 

0.5

Degree of processing

86.11%

94.44%

95.00%

76.92%

89.58%

87.50%

Note: The value outside the brackets is the control index when the water temperature is >12℃, and the value in the bracket is the control index when the water temperature is ≤12℃.
 
1.1.5 Processing technology
The secondary treatment of sewage adopts the improved oxidation ditch treatment process; the advanced treatment of sewage adopts the high-efficiency sedimentation + filtration process, the filter adopts the denitrification deep bed filter, and the disinfection adopts the chlorine dioxide disinfection process.
 
1.1.6 Engineering Investment
The total investment of the third-phase project of Linquan County Sewage Treatment Plant is 79.8914 million yuan.
 
 
集中控制中心
 

 
反渗透工艺设备
 

 
现场照片
 

 
现场照片
 

 
斜管沉淀池
 

 
现场照片